Conservation Easement at Winje's Farm Conservation Easement

March 5, 2011

Fitting and alinging valve in headwall

Filed under: Uncategorized — rnwinje @ 8:15 am

Checking clearance between valve brackets and headwall angle irons

Filed under: Uncategorized — rnwinje @ 8:14 am

Lowering valve into the head wall while watching slack on chain

Filed under: Uncategorized — rnwinje @ 8:13 am

Tight fit requires a pry bar to shake valve while backhoe lowers unit

Filed under: Uncategorized — rnwinje @ 8:11 am

Tony cuts holes through brackets to hold valve to head wall

Filed under: Uncategorized — rnwinje @ 8:08 am

Lowest bolts just above water line

Filed under: Uncategorized — rnwinje @ 8:07 am

Bolts will allow future repairs

Filed under: Uncategorized — rnwinje @ 8:06 am

Installing piling to protect head wall

Filed under: Uncategorized — rnwinje @ 8:03 am

Checking alingment before exavator pushes piling into place

Filed under: Uncategorized — rnwinje @ 7:57 am

Russ cuts 8′ piling to length

Filed under: Uncategorized — rnwinje @ 7:55 am

Older Posts »

Powered by WordPress