Conservation Easement at Winje's Farm Conservation Easement

January 18, 2011

Miller Creek runoff flowing to the north end of the main field

Filed under: Uncategorized — rnwinje @ 9:26 am

January 7, 2011

Special blade put on Chain saw to cut Vinyl

Filed under: Uncategorized — rnwinje @ 4:51 pm

Vinyl must be cut with a special blade.

Positioning First Cut

Filed under: Uncategorized — rnwinje @ 4:49 pm

The width of the notch is set with the first cut.

Sizing Gap

Filed under: Uncategorized — rnwinje @ 4:48 pm

Width of gap set with second cut.

Selecting Control Level

Filed under: Uncategorized — rnwinje @ 4:43 pm

Each notch is cut to elevation to allow water to flow out of ditch and into field, or down ditch to next structure.

Cutting Bottom

Filed under: Uncategorized — rnwinje @ 4:41 pm

Moving Down Ditch

Filed under: Uncategorized — rnwinje @ 4:39 pm

Each structure is notched.

Notch Cut In Grade Stabilizing Structure

Filed under: Uncategorized — rnwinje @ 4:37 pm

2x12s will be set to elevation to raise water out of ditch, or removed to allow water to continue down ditch.

January 2, 2011

New Bridge Across New Ditch At Culvert

Filed under: Uncategorized — rnwinje @ 9:23 am

Notice the Culvert as seen under the new bridge.

Close View Of A Grade Stabilizing Structures

Filed under: Uncategorized — rnwinje @ 9:20 am

Each structure will be cut out to let the water pass through, or allow a wood plank to stop and lift the water over the ditch bank and into the field.